Charging quote / Fleet depots
Fleet depots

Charging sized to how your fleet runs.

Depot charging for electric vans, trucks and Class 8 tractors, owned by the operator. Sized to your routes, your shifts and the power your yard can get.

  • Host-owned · owned by the property
  • Quoted to your site, not from a catalogue
  • No site visit for the first pass
Why it fits

The schedule sets the charger, not the other way round.

A fleet that parks overnight can charge slowly and cheaply. A fleet that runs two shifts needs fast turnarounds between them. We start from your routes and dwell times, then size the chargers and the power to match.

For Class 8 trucks like the Tesla Semi, Megacharger-class equipment can recharge during a driver's required break. Depots near freight corridors can also open stalls to outside trucks.

What we quote

The charging that suits fleet depots.

01

Overnight depot charging

Level 2 or lower-power DC for vehicles that sit through the night.

02

DC fast charging

For quick turnarounds between shifts and routes.

03

Megacharger-class

Up to 1.2 MW for Class 8 electric trucks like the Tesla Semi. More on Tesla Semi charging →

What hosting asks

What we look at first.

01

Power to the yard

Fleet charging can need a large service upgrade. The utility's schedule usually sets the project timeline, so we start there.

02

Duty cycle

Your routes, shifts and dwell times decide how many chargers you need and at what power.

03

Yard layout

Pull-through stalls, cable reach and truck circulation shape where chargers go.

Incentives & credits

We look for the money that may apply.

Utility make-ready programs, state grants and federal programs can reduce what a project costs, depending on where the site is and which funding rounds are open. We check what your site may qualify for, work with our grant writing partners on applications and build it into the quote. No program, award or amount is guaranteed.

In California, Oregon and Washington, metered public charging can also earn clean-fuel credits. Credit prices move with the market, so we show them as their own line, never as a promise. How the credits work →

How it works

From your address to a fixed-scope quote.

01

Site check

Send us the address. We screen it remotely against utility territory, service capacity, parking layout and traffic.

02

Model

Utilization and charging revenue, with every assumption stated and yours to audit.

03

Fixed-scope quote

A scoped quote you can keep either way.

04

Build

Revio pulls the project together: the installer, financing options, and our grant writing and LCFS credit broker partners for incentive applications and credits where they apply. Licensed install partners, Tesla certified where the hardware is Tesla’s, handle engineering, permitting and installation under a contract with you.

Straight answers

What owners ask first.

How many chargers does a fleet need?

It depends on how many vehicles charge at once, how long they sit and how far they run. We size it from your duty cycle, not a ratio.

Can a fleet depot qualify for grants or utility programs?

It may. Fleet and medium and heavy duty programs exist in many states and utilities, and they open and close by funding round. We check what fits your yard; none of it is guaranteed.

Who owns the chargers?

You do. Revio develops the station as your asset rather than leasing your stalls to a network, so the equipment and the charging revenue stay with the property.

Is any of this guaranteed?

No. Charging revenue depends on traffic, pricing and uptime, credit prices where they exist float with the market, and store sales from charging drivers depend on your site. Every figure in your quote is a stated assumption you can audit, not a promise.

Charging quote

See what your property can support.

Tell us about the site and we come back with a fixed-scope quote. Every figure in it is an estimate you can audit, not a promise.